ECLON already was certified according to SCC Petrochemical and ISO 9001. After our move to Ruurlo, the audits were moved to see if we are up to date on our new location. Besides ISO 9001 and SCC Petrochemical ECLON is now certified according to the following standards: ISO 9001 ISO 3834-2 EN 1090-1 EN 10204...
Read More
The office and workshop are closed during the holidays (week 52 and 1). If you want to contact us during the holidays, get in touch via the contact form on the contact page. We will get back to you as soon as possible. Is there something ECLON can do for you before or during the holidays? Do...
Read More
The past month we’ve been working on various kind of rotating equipment with two project teams. In Germany a periodic inspection took place for a SGT700. Besides mechanical assistance there also was a certified welder on-site. The second team is active in our own country the Netherlands. The toolcontainer was transported to site as well....
Read More
Due to the growth of our workshop activities we moved to Ruurlo. With a bigger work surface divided in three separate spaces, we are able to serve our customers better and more efficient. We are able to separate carbon steel and stainless steel during production as well as the welding and grinding activities from the...
Read More
ECLON has manufactured a complete air system as part of a composting installation for a client specialised in waste treatment. ECLON has carried out the following: manufacture of frames, steel and stainless steel piping, mechanical & electrical installation of the skids as well as the placement and installation on site. Trucks have been loaded in...
Read More
Some of our colleagues are enjoying their holiday, others are working hard on several projects both in the workshop as well as project locations. Our opening hours are unchanged and also last-minute requests are handled like usual. In the meantime we have received some nice pictures, this time not from the fieldservice but from the...
Read More
Update! In cooperation with our client the waste sorting installation is succesfully tested. After the test the installation is transported to the place of destination. Here the last finishing touches were put to the waste sorting installation. Below you can find pictures of the test set up and installation on site. ECLON as subcontractor ECLON...
Read More
Last month audits took place in order to check whether ECLON is still working according to the guidelines of ISO 9001 and SCC Petrochemicals. Safety and quality are of the utmost importance to ECLON, so we are glad to announce we had a positive review. The certificates can be found under downloads.
Read More
In our workshop we have been working on tunnel doors for a waste treatment plant located in Canada the past month. After ECLON purchased the materials, the tunnel doors were assembled and delivered, ready for transport. In May the doors will be shipped to Canada. This month we also started to create a waste sorting...
Read More
One of our Electrical Supervisors will supervise the installation of a waste treatment plant on-site in China. Before the actual start of the installation activities FAT tests were conducted. During this trip to China, there was some spare time, which our supervisor used to see some of Shanghai as you can see on the pictures....