News

28
Nov

Adjusted opening hours during holidays

The office and workshop are closed during the holidays (week 52 and 1). If you want to contact us during the holidays, get in touch via the contact form on the contact page. We will get back to you as soon as possible. Is there something ECLON can do for you before or during the holidays? Do...
Read More
31
Oct

Project teams on location

The past month we’ve been working on various kind of rotating equipment with two project teams. In Germany a periodic inspection took place for a SGT700. Besides mechanical assistance there also was a certified welder on-site. The second team is active in our own country the Netherlands. The toolcontainer was transported to site as well....
Read More
30
Sep

Eclon moved to Ruurlo

Due to the growth of our workshop activities we moved to Ruurlo. With a bigger work surface divided in three separate spaces, we are able to serve our customers better and more efficient. We are able to separate carbon steel and stainless steel during production as well as the welding and grinding activities from the...
Read More
28
Aug

Prefab to installation

ECLON has manufactured a complete air system as part of a composting installation for a client specialised in waste treatment. ECLON has carried out the following: manufacture of frames, steel and stainless steel piping, mechanical & electrical installation of the skids as well as the placement and installation on site. Trucks have been loaded in...
Read More
30
Jul

Summer schedule

Some of our colleagues are enjoying their holiday, others are working hard on several projects both in the workshop as well as project locations. Our opening hours are unchanged and also last-minute requests are handled like usual. In the meantime we have received some nice pictures, this time not from the fieldservice but from the...
Read More
1 2 3 4 7