Last year we carried out a nice project for WTT. The scope was interesting and diverse.
➡️ Lifting and installation of scrubber, heat exchanger, ventilator and carbon steel frame;
➡️ (Pre)fabrication and installation of aluminium and stainless steel air ducts;
➡️ (Pre)fabrication and installation of carbon steel piping and tank;
➡️ Electrowelding of plastic piping, PE welding underground and ground works;
➡️ Installation and bonding of PVC-u piping;
➡️ Installation of MCC, DCC, cable trays and field cabling;
➡️ Connection with existing system during planned stop
Special thanks to the following companies. Bolk, for the transportation of the prefabrication parts, tooling- and hoisting container. Enzerink B.V. has carried out the ground works. Mateco has provided us with a telehandler and skylift.
Would you like to know more what we can do for your project? Do not hesitate to contact us!