News

31
Mar

Rotating equipment

Last two months we had some very nice rotating equipment projects going on. Both planned and unplanned (urgent) projects. For a German customer we have provided mechanical support (engineers) to do inspection/maintenance on two SGT700 gasturbines. A Dutch customer called us on Sunday after a tripped axial compressor, for assistance on Monday morning 0700. For...
Read More
27
Feb

Overhead cranes!

Six months ago we moved to our current facility te Ruurlo (NL) Main reasons were the need for more space, and the possibility to install overhead cranes. At the time of moving, we were also working on several projects which made us to postpone our internal projects. In the mean time we have installed a...
Read More
31
Jan

Diversity of projects

  We like to work on several projects. Industrial installations, fabrication of skids and piping and more. But what means more? Well let us show you some examples out of the smaller projects. Smaller in scope, but least as important for us. We have worked lately on:
Read More
20
Dec

ISO, EN and SCC certificates

ECLON already was certified according to SCC Petrochemical and ISO 9001. After our move to Ruurlo, the audits were moved to see if we are up to date on our new location. Besides ISO 9001 and SCC Petrochemical ECLON is now certified according to the following standards: ISO 9001 ISO 3834-2 EN 1090-1 EN 10204...
Read More
28
Nov

Adjusted opening hours during holidays

The office and workshop are closed during the holidays (week 52 and 1). If you want to contact us during the holidays, get in touch via the contact form on the contact page. We will get back to you as soon as possible. Is there something ECLON can do for you before or during the holidays? Do...
Read More
1 2 3 7